সিটি গভারন্যান্স প্রজেক্ট (সিজিপি)
Package No. |
Name of the Sub-Project |
Quantity (Km/m/nos) |
Estimated Cost (BDT) |
Contract Amount(BDT) |
Date of Contract |
Date of Completion |
Time Elapsed |
Physical Progress (%) |
Financial Progress |
|||||||
Original |
Revised |
As per Contract |
Extension of Time (if any) |
Up to previous Month |
Reporting Month |
Cumulative Progress |
Up to previous Month (BDT) |
Reporting Month (BDT) |
Cumulative (BDT) |
Cumulative Progress (%) |
||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
ICGP B2 CoCC 01 |
(b) Development of RCC road from Old Ctg road (Chowara cattle market) to Dhaka – Chittagong Highway(matiara) via hindu para Ch:0+00 to 1+586m)+ 26m span bridge. (c) Reconstruction of road by BC from Lacsam road to Airport road, and Kazipara road via herapur ,Mostapur, Laxminagar, Disabond and Kazipara (Ch:2+00 to 3+288). |
Road=2874.00 m |
104112000.00 |
104087183.586 |
104216126.100 |
17.12.2017 |
16.12.2018 |
03.03.2020 |
957 |
100% |
0% |
100% |
102892642.00 |
0.00 |
102892642.00 |
98.73% |
ICGP B2 CoCC 02 |
Part: 1, Road Improvement |
Road=14305.00 m ; |
381606267.00 |
381570268.102 |
431180335.4 |
26.6.2018 |
25.10.2019 |
31.07.2021 |
796 |
93.0% |
0.0% |
93.0% |
288385950.00 |
57384324.00 |
345770274.00 |
80.19% |
a) Re-construction of road start from Dhaka-Chittagong Highway road (Joypur) to Kotbari road (Singapur Market) area by B.C. (Ch. 00+00 to 1+975). |
||||||||||||||||
Part: 2, Drainage |
||||||||||||||||
a) Contruction of RCC Drain Dhaka- Chittogong Highway to Mostapur Khal via Shree-Bollovpur & Uttar Rampur (Ch.2+000 to Ch.3+288). |
||||||||||||||||
ICGP B2 CoCC 03 |
Part: 1, Road improvement |
Road=20340.00 m ; |
426058441.00 |
425942046.801 |
486669815.00 |
26.06.2018 |
25.10.2019 |
30.06.2021 |
796 |
99% |
0% |
99% |
430684478.00 |
0.00 |
430684478.00 |
88.50% |
Part: 2, Drainage |
||||||||||||||||
a) Contruction of Drain (RCC) From Laxmipur Khal to Dhaka- Chittagong Highway Besides Airport Road & From Doyapur Madrasa (Ch. 0+000-0+712)Link -1 (Ch.0+000-1+372) |
||||||||||||||||
ICGP B2 CoCC 04 |
(c) Re-construction of 16m span R.C.C. Bridge at Kazipara. |
Bridge=03 nos; Length=(16+10+13.50)=39.50m |
52805135.00 |
52805428.311 |
51272528.75 |
17.12.2017 |
16.12.2018 |
02.03.2021 |
987 |
100% |
0% |
100% |
40191921.34 |
0.00 |
40191921.34 |
78.39% |
ICGP B2 CoCC 05 |
(a) Excavation of Khal from Medical Hospital to EPZ road with beautification. (Ch:0.00 to 0+800 m). |
28474.00 m |
166506000.00 |
166391319.708 |
189388579.000 |
09.07.2018 |
30.09.2019 |
30.06.21 |
783 |
95% |
1% |
96% |
153350643.00 |
14549464.00 |
167900107.00 |
88.65% |
ICGP B2 CoCC 06 |
Installation of 9 Nos Production Tubewell including pump house with all other accessories in ward no. 1 to 27. |
9 nos production tube well |
56808625.00 |
58456000.00 |
58456000.00 |
27.11.2018 |
26.11.2019 |
07.02.2020 |
642 |
70% |
0% |
70% |
0.00 |
0.00 |
0.00 |
0.00% |
ICGP B2 CoCC 07 |
Installation of street lighting system in different areas of CoCC ( 2550 GI pole for with 2550 nos. LED light including all accessories) |
GI pole=2550 & LED light=2550. |
206860700.00 |
194959981.00 |
218974168.99 |
22.01.2018 |
21.01.2019 |
03.03.2021 |
921 |
78% |
0% |
78% |
139290191.00 |
0.00 |
139290191.00 |
63.61% |
ICGP B2 CoCC 08 |
(b) Construction of drain, footpath and road at Fazlul Hoque road (from Kandirpar to Rajgonz ) Ch:o+00 to 0+729m)and construction of drain and footpath from Post office or Circit house to Rajgonz. (Ch:0+00 to 0+626m). |
Road = 729 m & Drain=4029m |
150645000.00 |
156577124.38 |
156550269.00 |
22.01.2018 |
21.01.2019 |
02.03.2021 |
921 |
94% |
2% |
96% |
142127782.00 |
0.00 |
142127782.00 |
90.79% |
ICGP B2 CoCC 09 |
b) (i) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Ch.0+000-1+063. |
Road=2283.00 m ; |
146637775.00 |
146621533.699 |
167678790.000 |
17.12.2017 |
16.12.2018 |
31.07.2021 |
957 |
99% |
1% |
100% |
128849626.00 |
24290890.00 |
153140516.00 |
91.33% |
b) (ii) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Link, Ch.0+000-0+341. |
||||||||||||||||
c) (i) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Ch.0+000-1+690. 1 x 1 m x 1 m Size Box Culvert at Ch.0+603, 0+825, 0+928, 1+207, 1+351, 1+385. & 1 x 3 m x 1.5 m Size Box Culvert at Ch.1+325,& 1x1.5mx1.5m box culvert at Ch.1+588. |
||||||||||||||||
c) (ii) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Link, Ch.0+000-0+593. 1 x 1.5 m x 1.5 m Size Box Culvert at Ch.0+476. |
||||||||||||||||
f) (ii) Reconstruction of drain from Laksam road to Easin market via Mirpukurpar, Ch.0+000-0+402. |
||||||||||||||||
g) Reconstruction of drain from Thomson bridge - EPZ (North side) - Housing Estate - Medical College near Bakhrabad Gas office.Ch.0+000-2+450. & Link drain At Ch.1+755(R/S), Ch.0+000-0+250. |
Package no |
Name of Sub-Project |
Quantity (Km/m/nos) |
Estimated cost (BDT) |
Contract Amount (BDT) |
Date of Contract |
Date of completion |
Time Elapsed |
Physical progress (%) |
Financial Progress |
Cumulative progress(%) |
|||||||
Original |
Revised |
As per Contract |
Extension of time (if any) |
Up to Previous month |
Reporting month |
Cumulative progress |
Up to Previous month (BDT) |
Reporting month (BDT) |
Cumulative (BDT) |
||||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
|
CGP B2 CuCC-10 |
a) Re-construction of BisnopurMoulavi para pukur par road by B.C (ch 0+00-0+400 M) |
Drain=992.0 m; Road=820.00 m |
45132750.00 |
45127318.808 |
45127318.81 |
09.01.2020 |
09.10.2020 |
03.03.2021 |
441 |
100.00% |
0.00% |
100.00% |
42317236.00 |
0.00 |
42317236.00 |
93.77% |
|
b) Construction of R.C.C road starting from BakChowmohani to Ranir’s Digi via Munsef Bari culvert (ch 0+00-0+420 M) |
|||||||||||||||||
c) Re-construction of R.C.C Drain starting from MugaltulyShaSuja Mosque to Riaz Uddin School (ch 00-0+675 ) |
|||||||||||||||||
d) Re-construction of R.C.C Drain starting from A.K. FazlulHoque to Monsef Bari Culvert (ch 0+00-0+317 M)
|
|||||||||||||||||
CGP B2 CuCC-11 |
Construction of BC road starting from Jagannathpur Mondir towards Land Port (Ch: 0-3000 m)
|
Road=3000 m |
82797000.00 |
82795204.146 |
90790956.57 |
10-02-20 |
11-10-20 |
30.06.2021 |
408 |
100.00% |
0.00% |
100.00% |
81084227.00 |
0.00 |
81084227.00 |
89.31% |
|
CGP B2 CuCC-12 |
a) Rehabilitation of B.C road starting from Janghalia Orphanege to Ruhul Amin’s home via Ram Nagar Mosque under city corporation (ward no.-21)
|
Road=1253.00 m; Drain=948.00 m |
34665089.00 |
3,46,52,318.974 |
38999168 |
27-02-2020 |
26-12-20 |
N/A |
392 |
90.00% |
10.00% |
100.00% |
23759735.00 |
0.00 |
23759735.00 |
60.92% |
|
b) Construction of RCC drain starting from Shaktola Rab Office to Gongajori Khal (Ch:0-405 m and link-1 Ch:0-228 m, link-2 Ch: 0-225 m, link-3 Ch: 0-50 m, and link-4 Ch: 0-40 m. )
|
|||||||||||||||||
CGP B2 CuCC-13 |
a) Construction of R.C.C . Drain with RCC road at Ashrafpur Modern housing road. Main-1 Ch:0-322 m, Main-2 Ch:0-220 m, with link-1 Ch:0-200 m. |
Drain=1164 m |
66142480.00 |
66131541.660 |
74833169.65 |
29/01/2020 |
29.10.2020 |
17.06.2021 |
421 |
93.00% |
7.00% |
100.00% |
54688929.00 |
0.00 |
54688929.00 |
73.08% |
|
b) Construction of R.C.C road starting from Doiara Lakshmipur Jame Mosque to Bisha Road (Moon CNG) under comilla city corporation (ward no. 22.) |
|||||||||||||||||
c) Construction of R.C.C road starting from Sreeballabpur in front of East para Kazi Bari to Manik Miahs house. Under comilla city corporation (ward no.22) |
|||||||||||||||||
d) Construction of R.C.C Road and RCC drain starting from Changhini main road to Hazi Hasem Miah Bari and Amin Ali’s home (ch 0+00-0+225 km);with link -1 ch: 0-189 m. |
|||||||||||||||||
e) Construction of HBB Road from Uttar Rampur Chob Ali, Bangla link tower to Rail line. Ch:0-720 m. |
|||||||||||||||||
f) Construction of RCC road and drain starting from Laksham road to Vasha Soinik Abu Taher House. (Ch.0+00 to 0+425) |
|||||||||||||||||
CGP B2 CuCC-14 |
a) Construction of R.C.C road at Tarapaiya (Motaleb’s shop) to Goal Mathan Pacca road & Dhayapur to Abu Shaheb’s house (ch. 0+00-0+1650 m) . |
road=5646.00 m ; Drain= 1315.00 m |
104139287.00 |
104125479.176 |
117215647.9 |
26.01.2020 |
26.10.2020 |
02.09.2021 |
424 |
100.00% |
0.00% |
100.00% |
98690189.00 |
15445051.00 |
114135240.00 |
97.37% |
|
b) Rehabilitation of B.C road starting from old Dhaka-Chittagong road Nawgaon Bazar Matha to Monirul Haque Chowdary Shaheb’s house & Laxmipur old Dhaka-Chittagong road .(Ch: 0-270 m and linkroad-1 Ch:0-120 m, Link-2 ch:0-570 m, link-3 Ch:0-40 m). |
|||||||||||||||||
c) Rehabilitation of RCC road starting from Raja Para (Doneswar) road to old Dhaka-Chittagong Highway via Doneswar east para jame mosque (ch 0+00-0+306 m). |
|||||||||||||||||
d) Re-construction of R.C.C Drain starting from Dayapu rMadrasha to Dhaka-Chittagong Highway to Matin Master home & LaipuraBaza Bari Mosque to Ful Miah Member’s home (ch 0+00-0+750 m) |
|||||||||||||||||
CGP B2 CuCC-15 |
a) Construction of R.C.C road and Drain starting from Old Dhaka-Chittagong Highway to Rail station. (Shahid Solaiman Mostofa Road,Ch: 0-375 m) . |
|
88818949.00 |
88796750.00 |
102045110.22 |
16.02.2020 |
15.11.2020 |
02.03.2021 |
402 |
91.00% |
2.00% |
93.00% |
64888588.00 |
19026278.00 |
83914866.00 |
82.23% |
|
b) Re-construction of RCC road with RCC drain at Kharam Potty (ch 0+00-0+245 M),with link-1 Ch:0-35 m, and link-2Ch:0-40 m. |
|||||||||||||||||
c) Construction of RCC Road and RCC drain from Lutfurnessa School to Abdur Rahaman Sarak. (ch 0+00 + 0+410 m). |
|||||||||||||||||
d) Construction of RCC Road from North Racecourse to Dhanmondi Road Ch:0-108 m, with link-1 Ch:0-100 m and link-2 Ch:0-20 m. |
|||||||||||||||||
e) Re-construction of RCC road & RCC drain starting from Tikkar Char Mosque to Tikkar Char Graveyard. (Ch.0+000 to 0+225 m). |
|||||||||||||||||
f) Re - construction of BC and RCC road and RCC drain from Nobab Bari mor to medical road, Ch:0-1025 m). |
|||||||||||||||||
g) Construction of R.C.C Drain starting from Bisnupur grave yard to KaptanBazat (Islampur) (ch 0+00-0+400 m) and liunk drain-1 ch:0-240 m. |
|||||||||||||||||
CGP B2 CuCC-16 |
a) Re-construction of RCC Drain starting from Nanua Digi (Taltola Cul.) to Circular road, ch 0-500 m. |
Drain=3535.00 m |
97882043.00 |
97870226.934 |
111618194.00 |
01/01/2020 |
01.11.2020 |
28.02.2021 |
449 |
97.00% |
3.00% |
100.00% |
82767168.00 |
22255830.00 |
105022998.00 |
94.09% |
|
b) Re-construction of R.C.C Drain starting from Zilla Parishad to WDB Office. (ch 0-475 m). |
|||||||||||||||||
c) Re-construction of RCC Drain start from Mofiz Uddin Sorak & Chistia Mosque road (ch 00-425 m). |
|||||||||||||||||
d) Re-construction of RCC Drain start from Income tax Office to Ashoktola chowmohani, ch 100-670 m. |
|||||||||||||||||
e) Re-construction of RCC Drain starting from Gulbagicha School to Eidgha via DPHE Office,ch 0-250 m. |
|||||||||||||||||
CGP B2 CuCC-17 |
a) Re-construction of R.C.C Drain starting from Kasari potty Mosque to Katabil Moulavipara (ch 0+00-0+240 m).
|
|
60882004.00 |
60870376.431 |
69833154.00 |
9.01.2020 |
9.10.2020 |
31.03.2021 |
441 |
97.00% |
3.00% |
100.00% |
55887907.00 |
0.00 |
55887907.00 |
80.03% |
|
b) Re-construction of R.C.C Drain & Footpath at both side of old Dhaka-Chittagong trunk road starting from Chalk Bazar to khal (ch 0+00-1+800 m).
|
|||||||||||||||||
CGP B2-18 |
|
LED light =496 nos. |
37214205 |
27985173.801 |
27985173.8 |
19.01.2020 |
19.10.2020 |
07.04.2021 |
431 |
17.00% |
0.00% |
17.00% |
0.00 |
0.00 |
0.00 |
0.00% |
|
CGP B2 CuCC-19 |
a) Re-construction of R.C.C Drain starting from Alam Cloth Store to Munsef Bari Culvert (ch 0+00-0+375 m). |
|
58972564 |
58958011.561 |
66393684.56 |
29/01/2020 |
29.10.2020 |
02.06.2021 |
421 |
98.00% |
2.00% |
100.00% |
48651096.00 |
0.00 |
48651096.00 |
73.28% |
|
b) Construction of R.C.C road starting from Songraish Kala Chand Shah Dighee Abdul Matin Master house to Gang Ayle (ch 0-00-0+400 m). |
|||||||||||||||||
c) Construction of R.C.C drain starting from Shah para Rasta to Pathuria Para grave yard Panel Mayor-2 house (ch 0+00-0+400)
|
|||||||||||||||||
d) Re-construction of R.C.C Drain starting from Idris Member home to shah para Bisho’s house (ch 0+00-0+415 m).
|
|||||||||||||||||
CGP B2-20 |
Construction of R.C.C Drain starting from Vatpara Chowmohoni to Kaliyajuri Chowmohoni. (ch 0+00-0+825 m). |
Drain=825.00 m |
34617496.00 |
34615564.754 |
39464025.91 |
01/01/2020 |
01.10.2020 |
30.06.2021 |
449 |
100.00% |
0.00% |
100.00% |
38138779.00 |
0.00 |
38138779.00 |
96.64% |
|
CGP B2 CuCC-21 |
a) Construction of R.C.C road starting from Dhaka-Chittagong Highway to rail gate via Gosh para Mondir under comilla city corporation. |
|
87091193.00 |
87079622.145 |
97584737.010 |
09-02-20 |
09-11-20 |
30.06.2021 |
410 |
95.00% |
0.00% |
95.00% |
73046100.00 |
15473629.00 |
88519729.00 |
90.71% |
|
b) construction of RCC road starting from SreeMontapur Eidgha to rail line via Laksam road under comilla city corporation. |
|||||||||||||||||
c) Construction of R.C.C Drain starting from EPZ 1st gate to Easin Market vai Tomson Bridge. (ch 0+00-1+523 m). |
|||||||||||||||||
CGP B2 CuCC-22 |
a) Re-construction of R.C.C Drain starting from Chalk Bazar Chowmohani to Zanu Miah Via 2nd Muradpur (ch 0+00-0+583). |
Drain=1941.00 m |
42277755.00 |
42261648.472 |
47766602.00 |
9.01.2020 |
30.11.2020 |
N/A |
441 |
97.00% |
3.00% |
100.00% |
43483424.00 |
0.00 |
43483424.00 |
91.03% |
|
b) Construction of R.C.C Drain starting from Chalk Bazar to Foisal Hospital to Nobab Bari with 5 Numbers Cross Culvert (ch 0+00-0+583 m). |
|||||||||||||||||
c) Construction of R.C.C Drain starting from Chalk Bazar Poura Market to 2nd Muradpur Culvert. (ch 0+00-0-1+775 m). |
|||||||||||||||||
CGP B2 -23 |
d) Re- construction of RCC road from Old Dhaka-Chattogram highway to road to New Dhaka-Chattogram Highway. Ch.0+000 to 1+480 m and link-1 Ch:0-150, link-2 ch:0-102 m and link-3 ch:0-95 m (Kalir bazar road with 6 nos box culvert). |
|
39056000.00 |
39026969.978 |
43738356.00 |
29/01/2020 |
29.10.2020 |
29.06.2021 |
421 |
100.00% |
0.00% |
100.00% |
33358290.00 |
4899999.00 |
38258289.00 |
87.47% |
CGP B2 -24 |
|
a) Improvement of road start from Sangraish to Sanitary land field (Bibir bazar) road (ward no. -17) at Ch. 00-1070m. b) Improvement of road start from old Ctg. (GodirPukurpar) to Mainamoti Medical Road via Sigma Hospital to Nurpur Primary School (ward no.-18) at Ch. 00-970m. c) Improvement of road start from Songraish bibir bazar road to Doctor bari road and Takpukurpar road (ward no.16) at Ch. 00-0+130m. & 300m. d) Improvement of road start from Engineer Mojibur House to New hostel (ward no.13) at Ch. 00-0+302m e) Improvement of road start from Jamtola road to Dha-Ctg New Highwayroad (ward no. 27) at Ch. 00-750m f) Improvement of road start from Tikkarchar graveyard to Bibir bazar road and Link-1,2,3 & 4(ward no. 17) at Ch. 00-630m g) Improvement of Kaptan Bazar Road (Ch. 0+000 to 0+100m) & Link-02 BeparyPokurpar Road (Ch. 0+000 to 0+472m). h) Improvement RCC Road Start from Kaptan Bazar Adv. Keramot Ali House to Bou Bazar Via Old Gomiti River (Ch. 0+000 to 0+226m). i) Improvement of RCC Drain & Road Start from Gobindapur Chowmohony Primary School to Khanka Sharif Mosque. (Drain Ch. 0+000 to 0+470 & Link 1 Ch. 060m, Link-2 Ch. 070, Link-3 Ch. 050, Link-4 Ch. 050, Link-5 Ch. 031, Link-6 Ch. 090 & 08 Nos Cross Drain) & (Road Ch. 0+000 to 0+498m) j) Improvement of RCC Drain & Road Start from Tomsom Bridge to M Ali Steel House. (Drain Ch. 0+000 to 0+213 & Link 1 Ch. 170m & 01 Nos Cross Drain) & (Road Ch. 0+000 to 0+213m, Link-01 Ch. 0+000 to 0+170m & Link-02 Ch. 0+000 to 0+045m). k) Estimate for Construction of of RCC Road at Chakbazar Teri Pottry Road (Ch. 0+000 to 0+281m). l) Estimate for Construction of Road at Badsha Miah Bazar (Ch. 0+000 to 0+480m) With 03 Nos Cross Drian. |
Road= 7841 m, Cross Drian- 11 Nos |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
TEC Committee Regulation Submitted for Approved |
CGP B2 -25 |
|
a) Improvement of road start from Nobabbari road to Zinarpukur par road and Nobabbari road to Dhopabari road (ward no. 13) at Ch. 00-140m. and Ch. 00-160m. b) Improvement of road start from Ranir bazar road to Koatbari (Rammala) road (ward no. 8) at Ch. 00-1120m c) Improvement of road start from Lacsam road to EPZ (Sobujkuti) road and Sadargazi road with Link (ward no. 21 (at Ch. 00-580 m and Ch.0-277, Link-1-(Ch.0-210), Link 2 (Ch. 0-95) d) Improvement of road start from New Dhk-Ctg Highway to Old Dhk-Ctg Highway Road (Khamarbari) with link-1,2 & 3 at Ch. 00-1140m e) Improvement RCC Road Start from Old Dhk-Ctg Highway to Mugoltoly road (Jamtoli road) Ch.00-170 f) Improvement RCC Road Start from Old Dhk-Ctg Highway to Mugoltoly road (Zilapipotti road) Ch.00-150 g) Improvement RCC Road Start from Badurtola QR tower to kandir par road Ch.00-160m. h) Improvement RCC Road Start from Talpukur par to Nazrul Avenue Ch.00-150 i) Improvement RCC Road Start from Police line Grammen office road to Talpukur par road and Link. (Ch. 0-420) and (Ch. 0+350) m. |
Road= 12963 m |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
--- |
TEC Committee Regulation Submitted for Approved |