Wellcome to National Portal
Text size A A A
Color C C C C

সর্ব-শেষ হাল-নাগাদ: ১st নভেম্বর ২০২১

সিটি গভর্নেন্স প্রকল্প

 

তথ্য হাল নাগাদ কার্যক্রম চলমান

সিটি গভারন্যান্স প্রজেক্ট (সিজিপি)

 

Package No.

Name of the Sub-Project

Quantity (Km/m/nos)

Estimated Cost (BDT)

Contract Amount(BDT)

Date of Contract

Date of Completion

Time Elapsed

Physical Progress (%)

Financial Progress

Original

Revised

As per Contract

Extension of Time (if any)

Up to previous Month

Reporting Month

Cumulative Progress

Up to previous Month (BDT)

Reporting Month (BDT)

Cumulative (BDT)

Cumulative Progress (%)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

ICGP B2 CoCC 01

 (b) Development of RCC road from Old Ctg road (Chowara cattle market) to Dhaka – Chittagong Highway(matiara) via hindu para Ch:0+00 to 1+586m)+ 26m span bridge. (c)  Reconstruction of road by BC from Lacsam road to Airport road, and Kazipara road via herapur ,Mostapur, Laxminagar, Disabond and Kazipara (Ch:2+00 to 3+288).

Road=2874.00 m

104112000.00

104087183.586

104216126.100

17.12.2017

16.12.2018

03.03.2020

957

100%

0%

100%

102892642.00

0.00

102892642.00

98.73%

ICGP B2 CoCC 02

Part: 1, Road Improvement

Road=14305.00 m ;
Drain=7351.00 m

381606267.00

381570268.102

431180335.4

26.6.2018

25.10.2019

31.07.2021

796

93.0%

0.0%

93.0%

288385950.00

57384324.00

345770274.00

80.19%

a) Re-construction of road start from Dhaka-Chittagong Highway road (Joypur) to Kotbari road (Singapur Market) area by B.C. (Ch. 00+00 to 1+975).
 b) Re-construction of road start from Kotbari road (Beltoly School gate) to Batabaria moszid by B.C (Ch. 00+00 to 1+782).
 c) Development of Monipur road (from Batabaria to City Boundary) by B.C. (Ch. 00+00 to 1+902).
 d) Re-construction of road start from Kotbari road (Gondmoty Moszid) to Museum Road (Shalbon high school & opposite side of BARD boundary) & Gabtoli beby stand via Bagmara & Lalmai area by B.C. Length:2063m &  4 nos link road: Length:3833m, Total effective length: 5896m.
 e) Repairing of Museum Road (Kotbari road to University) by B.C. (Ch. 00+00 to 02+750m).

Part: 2, Drainage

a) Contruction of RCC Drain Dhaka- Chittogong Highway to Mostapur Khal via Shree-Bollovpur & Uttar Rampur (Ch.2+000 to Ch.3+288).
 b) Construction of RCC drain Start at Joypur area from Dolupukurpar to Gongujury Khal (Ch.0+000 to Ch. 1+515).
c) Construction of RCC Drain at Kotbari road from BARD to Gongojory Khal, Length: 2398m & Extension from BARD to BDR camp: Length: 800m, Total Effective Length: 3198m.
 d) Construction of RCC Drain at Batabaria start from Dhaka-Chittagong Highway road and Batabaria Masjid to Batabaria High school (Ch. 00+00 to 1+350).

ICGP B2 CoCC 03

Part: 1, Road improvement
a) Reconstruction  of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road (Laxmipur  Chownohony) Via Gram Chowara And  Laxmipur By B.C From I.SG.( Ch. 0+000 to 02+ 855 m).
b) Reconstruction  of Road Start From Old Dhaka-Chittagong Highway road (Near City Corporation Office) Via Raypur, Dayapur. Link From Doyapur Madrasa to Dhaka-Chittagong Highway Road  By B.C From I.SG. (Ch. 0+000 to 02+ 772 m).
 c) Contraction of Road  Start  From Dhaka-Chittagong Highway Road to Airport Road, Domoria Road & Tarapaia  Road Via Laxminagar, Laxmipur Katcha Road By B.C (Ch. 00+00 to 02+ 284 m) Link -1(Ch. 0+ 000 To 0+  278) Link -2(Ch. 0+000 To 0+ 625)
 d) Reconstruction  of Road Start From Old Dhaka-Chittagong Highway Road (Old Chowara) to Rajapara (Near Post Office) Via Domoria, Tarapaia  & Noapara By B.C  From I.S.G (Ch. 0+000 to 03+302m)
e) Reconstruction  of Dhaneshor Road (From Old Dhaka - Chittagong Highway Road to Airport Road) By B.C From I.S.G. (Ch.0+000 to 02+368m).
 f) Reconstruction  of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road Via Goalmothon & Rajapara By B.C From I.S.G (Ch.0+000 to 02+812m). Link -1 (Ch.0+000 to 0+700)
g) Reconstruction  of Road Start From Old Dhaka-Chittagong Highway Road  (Chowara Madrasha & Chira Mill) to Dhaka-Chittagong Highway Road (Matiara & Chashapara) By B.C From I.S.G.(Ch.0+000 to 1+148m). Link -1 (Ch.0+000 to 0+657) Link-2 (Ch.0+000 to 0+539)

Road=20340.00 m ;
Drain=4533.00 m

426058441.00

425942046.801

486669815.00

26.06.2018

25.10.2019

30.06.2021

796

99%

0%

99%

430684478.00

0.00

430684478.00

88.50%

Part: 2, Drainage

 a) Contruction of Drain (RCC) From Laxmipur Khal to Dhaka- Chittagong Highway Besides Airport Road & From Doyapur Madrasa (Ch. 0+000-0+712)Link -1 (Ch.0+000-1+372)
b) Contruction of Drain (RCC) From Sonaichori Khal to Funka Industries Besides Old Dhaka-Chittagong Highway Road.(Ch.0+000-2+449)

ICGP B2 CoCC 04

(c) Re-construction of  16m span R.C.C.  Bridge at Kazipara.
(d) Re-construction of  10m span R.C.C.  Bridge at Near Noagah Chowmohony over katakhali khal.
(h) Construction of  3X5.0mX4.0m RCC Box Culvert at Rececourse Khalpar.

Bridge=03 nos; Length=(16+10+13.50)=39.50m

52805135.00

52805428.311

51272528.75

17.12.2017

16.12.2018

02.03.2021

987

100%

0%

100%

40191921.34

0.00

40191921.34

78.39%

ICGP B2 CoCC 05

(a) Excavation of Khal from Medical Hospital to EPZ road with beautification. (Ch:0.00 to 0+800 m).
(b) Excavation of Airport khal (EPZ poket gate to Gopenathpur khal/Canal). (Ch: 0+00 to 5+00 m)
(c) Excavation of Unaishar khal (South- Westen side of EPZ wall to Gopenathpur khal/Canal via Kazipara-Hirapur) with beautification. (Ch: 0.00 to 7+00 m)
(d) Excavation of  Kuchaitoly khal (Kuchaitoly to Gopenathpur khal/Canal via Donessor-Rajapara-Tarapaia).(Ch: 0+00 to 15+00m).                                                                                                                                            (e) Excavation of Sonaichori khal/Canal (from Pathankot to Gopenathpur khal/Canal via Chowara Bazar Matiara).(Ch:0+00 to 6+000 m).

28474.00 m

166506000.00

166391319.708

189388579.000

09.07.2018

30.09.2019

30.06.21

783

95%

1%

96%

153350643.00

14549464.00

167900107.00

88.65%

ICGP B2 CoCC 06

Installation of 9 Nos Production Tubewell including  pump house with all other accessories in ward no. 1 to 27.                                                                                                                                                                                

9 nos production tube well

56808625.00

58456000.00

58456000.00

27.11.2018

26.11.2019

07.02.2020

642

70%

0%

70%

0.00

0.00

0.00

0.00%

ICGP B2 CoCC 07

Installation of street lighting system in different areas of CoCC ( 2550 GI pole for with  2550  nos. LED light including all accessories)

GI pole=2550 & LED light=2550.

206860700.00

194959981.00

218974168.99

22.01.2018

21.01.2019

03.03.2021

921

78%

0%

78%

139290191.00

0.00

139290191.00

63.61%

ICGP B2 CoCC 08

                                                                                                                                                                                                                                      (b) Construction of  drain, footpath and  road at Fazlul Hoque road (from Kandirpar to Rajgonz ) Ch:o+00 to 0+729m)and  construction of drain  and footpath from Post office or Circit house to Rajgonz. (Ch:0+00 to 0+626m).
(c) Construction of Drain Judge Court- Eidgah- Stadium Market- New Market – Kandirpar to Circular road side khal at Hotel Salauddin.(Ch:0+00 to 1+900 m)
 

Road = 729 m  & Drain=4029m      

150645000.00

156577124.38

156550269.00

22.01.2018

21.01.2019

02.03.2021

921

94%

2%

96%

142127782.00

0.00

142127782.00

90.79%

ICGP B2 CoCC 09

b) (i)  Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni  (Laksam road) via RAB office, Ch.0+000-1+063.

Road=2283.00 m ;
Drain=4556.00 m

146637775.00

146621533.699

167678790.000

17.12.2017

16.12.2018

31.07.2021

957

99%

1%

100%

128849626.00

24290890.00

153140516.00

91.33%

b) (ii)  Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni  (Laksam road) via RAB office, Link, Ch.0+000-0+341.

c) (i) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Ch.0+000-1+690. 1 x 1 m x 1 m Size Box Culvert at Ch.0+603, 0+825, 0+928, 1+207, 1+351, 1+385. & 1 x 3 m x 1.5 m Size Box Culvert at Ch.1+325,& 1x1.5mx1.5m box culvert at Ch.1+588.

c) (ii) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Link, Ch.0+000-0+593. 1 x 1.5 m x 1.5 m Size  Box Culvert at Ch.0+476.

f) (ii) Reconstruction of drain from Laksam road to Easin market via Mirpukurpar, Ch.0+000-0+402.

g) Reconstruction of drain from Thomson bridge - EPZ (North side) - Housing Estate - Medical College near Bakhrabad Gas office.Ch.0+000-2+450. & Link drain At Ch.1+755(R/S), Ch.0+000-0+250.

 

Package no

Name of Sub-Project

Quantity (Km/m/nos)

Estimated cost (BDT)

Contract Amount (BDT)

Date of Contract

Date of completion

Time Elapsed

Physical progress (%)

Financial Progress

Cumulative progress(%)

 

Original

Revised

As per Contract

Extension of time (if any)

Up to Previous month

Reporting month

Cumulative progress

Up to Previous month (BDT)

Reporting month (BDT)

Cumulative (BDT)

 
 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

 

CGP B2 CuCC-10

a) Re-construction of BisnopurMoulavi para pukur par road by B.C (ch 0+00-0+400 M)

Drain=992.0 m;   

 Road=820.00 m

45132750.00

45127318.808

45127318.81

09.01.2020

09.10.2020

03.03.2021

441

100.00%

0.00%

100.00%

42317236.00

0.00

42317236.00

93.77%

 

b) Construction of R.C.C road starting from BakChowmohani to Ranir’s Digi via Munsef Bari culvert (ch 0+00-0+420 M)

 

c) Re-construction of R.C.C Drain starting from MugaltulyShaSuja Mosque to Riaz Uddin School (ch 00-0+675 )

 

d) Re-construction of R.C.C Drain starting from A.K. FazlulHoque to Monsef Bari Culvert (ch 0+00-0+317 M)

 

 

 

 

CGP B2 CuCC-11

Construction of BC road starting from Jagannathpur Mondir towards Land Port (Ch: 0-3000 m)

 

 

Road=3000 m

82797000.00

82795204.146

90790956.57

10-02-20

11-10-20

30.06.2021

408

100.00%

0.00%

100.00%

81084227.00

0.00

81084227.00

89.31%

 

CGP B2 CuCC-12

a) Rehabilitation of B.C road starting from Janghalia Orphanege to Ruhul Amin’s home via Ram Nagar Mosque under city corporation (ward no.-21)

 

 

 

Road=1253.00 m; Drain=948.00 m

34665089.00

3,46,52,318.974

38999168

27-02-2020

26-12-20

N/A

392

90.00%

10.00%

100.00%

23759735.00

0.00

23759735.00

60.92%

 

b) Construction of RCC drain starting from Shaktola Rab Office to Gongajori Khal (Ch:0-405 m and link-1 Ch:0-228 m, link-2 Ch: 0-225 m, link-3 Ch: 0-50 m, and link-4 Ch: 0-40 m. )

 

 

 

 

 

CGP B2 CuCC-13

a) Construction of R.C.C . Drain with RCC road at Ashrafpur Modern housing road. Main-1 Ch:0-322 m, Main-2 Ch:0-220 m, with link-1 Ch:0-200 m. 

Drain=1164 m
Road=3176 m

66142480.00

66131541.660

74833169.65

29/01/2020

29.10.2020

17.06.2021

421

93.00%

7.00%

100.00%

54688929.00

0.00

54688929.00

73.08%

 

b) Construction of R.C.C road starting from Doiara Lakshmipur Jame Mosque to Bisha Road (Moon CNG) under comilla city corporation (ward no. 22.)

 

c) Construction of R.C.C road starting from Sreeballabpur in front of East para Kazi Bari to Manik Miahs house. Under comilla city corporation (ward no.22)

 

d) Construction of R.C.C Road and RCC drain starting from Changhini main road to Hazi Hasem Miah Bari and Amin Ali’s home (ch 0+00-0+225 km);with link -1 ch: 0-189 m.

 

e) Construction of HBB Road from Uttar Rampur Chob Ali, Bangla link tower to Rail line. Ch:0-720 m.

 

f) Construction of RCC road and drain starting from Laksham road to Vasha Soinik Abu Taher House. (Ch.0+00 to 0+425)

 

CGP B2 CuCC-14

a) Construction of R.C.C road at Tarapaiya (Motaleb’s shop) to Goal Mathan Pacca road  & Dhayapur to Abu Shaheb’s house (ch. 0+00-0+1650 m) .

road=5646.00 m ;                                                                                  Drain= 1315.00 m

104139287.00

104125479.176

117215647.9

26.01.2020

26.10.2020

02.09.2021

424

100.00%

0.00%

100.00%

98690189.00

15445051.00

114135240.00

97.37%

 

b) Rehabilitation of B.C road starting from old Dhaka-Chittagong road Nawgaon  Bazar Matha to Monirul Haque Chowdary Shaheb’s house & Laxmipur old Dhaka-Chittagong road .(Ch: 0-270 m and linkroad-1 Ch:0-120 m, Link-2 ch:0-570 m, link-3 Ch:0-40 m).

 

c) Rehabilitation of RCC road starting from Raja Para (Doneswar) road to old Dhaka-Chittagong Highway via Doneswar east para jame mosque (ch 0+00-0+306 m).

 

d) Re-construction of R.C.C Drain starting from Dayapu rMadrasha to Dhaka-Chittagong Highway to Matin Master home & LaipuraBaza Bari Mosque to Ful Miah Member’s home (ch 0+00-0+750 m)

 

CGP B2 CuCC-15

a) Construction of R.C.C road and Drain starting from Old Dhaka-Chittagong Highway to Rail station. (Shahid Solaiman Mostofa Road,Ch: 0-375 m) .

 

88818949.00

88796750.00

102045110.22

16.02.2020

15.11.2020

02.03.2021

402

91.00%

2.00%

93.00%

64888588.00

19026278.00

83914866.00

82.23%

 

b) Re-construction of RCC road with RCC drain at Kharam Potty (ch 0+00-0+245 M),with link-1 Ch:0-35 m, and link-2Ch:0-40 m.

 

c) Construction of RCC Road and RCC drain from Lutfurnessa School to Abdur Rahaman Sarak. (ch 0+00 + 0+410 m).

 

d) Construction of RCC Road from North Racecourse to Dhanmondi Road Ch:0-108 m, with link-1 Ch:0-100 m and link-2 Ch:0-20 m.

 

e) Re-construction of RCC road & RCC drain starting from Tikkar Char Mosque to Tikkar Char Graveyard. (Ch.0+000 to 0+225 m).

 

f) Re - construction of BC and RCC road and RCC drain from Nobab Bari mor to medical road, Ch:0-1025 m).

 

g) Construction of R.C.C Drain starting from Bisnupur grave yard to KaptanBazat (Islampur) (ch 0+00-0+400 m) and liunk drain-1 ch:0-240 m.

 

CGP B2 CuCC-16

a) Re-construction of RCC Drain starting from Nanua Digi (Taltola Cul.) to Circular road, ch 0-500 m.

Drain=3535.00 m

97882043.00

97870226.934

111618194.00

01/01/2020

01.11.2020

28.02.2021

449

97.00%

3.00%

100.00%

82767168.00

22255830.00

105022998.00

94.09%

 

b) Re-construction of R.C.C Drain starting from Zilla Parishad to WDB Office. (ch 0-475 m).

 

c) Re-construction of RCC Drain start from Mofiz Uddin Sorak & Chistia Mosque road (ch 00-425 m).

 

d) Re-construction of RCC Drain start from Income tax Office to Ashoktola chowmohani, ch 100-670 m.

 

e) Re-construction of RCC Drain starting from Gulbagicha School to Eidgha via DPHE Office,ch 0-250 m.

 

CGP B2 CuCC-17

a) Re-construction of R.C.C Drain starting from Kasari potty Mosque to Katabil Moulavipara (ch 0+00-0+240 m).

 

 

 

 

60882004.00

60870376.431

69833154.00

9.01.2020

9.10.2020

31.03.2021

441

97.00%

3.00%

100.00%

55887907.00

0.00

55887907.00

80.03%

 

b) Re-construction of R.C.C Drain & Footpath at both side of old Dhaka-Chittagong trunk road starting from Chalk Bazar to khal (ch 0+00-1+800 m).

 

 

 

 

 

CGP B2-18

Installation of Street LED Street Lighting at Gumti River Embankment Road Under Cumilla City Corporation.

 

 

 

 

 

LED light

=496 nos.

37214205

27985173.801

27985173.8

19.01.2020

19.10.2020

07.04.2021

431

17.00%

0.00%

17.00%

0.00

0.00

0.00

0.00%

 

CGP B2 CuCC-19

a) Re-construction of R.C.C Drain starting from Alam Cloth Store to Munsef Bari Culvert (ch 0+00-0+375 m).

 

58972564

58958011.561

66393684.56

29/01/2020

29.10.2020

02.06.2021

421

98.00%

2.00%

100.00%

48651096.00

0.00

48651096.00

73.28%

 

b) Construction of R.C.C road starting from Songraish Kala Chand Shah Dighee Abdul Matin Master house to Gang Ayle (ch 0-00-0+400 m).

 

c) Construction of R.C.C drain starting from Shah para Rasta to Pathuria Para grave yard Panel Mayor-2 house (ch 0+00-0+400)

 

 

 

d) Re-construction of R.C.C Drain starting from Idris Member home to shah para Bisho’s house (ch 0+00-0+415 m).

 

 

 

 

CGP B2-20

Construction of R.C.C Drain starting from Vatpara Chowmohoni to Kaliyajuri Chowmohoni. (ch 0+00-0+825 m).

Drain=825.00 m

34617496.00

34615564.754

39464025.91

01/01/2020

01.10.2020

30.06.2021

449

100.00%

0.00%

100.00%

38138779.00

0.00

38138779.00

96.64%

 

CGP B2 CuCC-21

a) Construction of R.C.C road starting from Dhaka-Chittagong Highway to rail gate via Gosh para Mondir under comilla city corporation.

 

87091193.00

87079622.145

97584737.010

09-02-20

09-11-20

30.06.2021

410

95.00%

0.00%

95.00%

73046100.00

15473629.00

88519729.00

90.71%

 

b) construction of RCC road starting from SreeMontapur Eidgha to rail line via Laksam road under comilla city corporation.

 

c) Construction of R.C.C Drain starting from EPZ 1st gate to Easin Market vai Tomson Bridge. (ch 0+00-1+523 m).

 

CGP B2 CuCC-22

a) Re-construction of R.C.C Drain starting from Chalk Bazar Chowmohani to Zanu Miah Via 2nd Muradpur (ch 0+00-0+583).

Drain=1941.00 m

42277755.00

42261648.472

47766602.00

9.01.2020

30.11.2020

N/A

441

97.00%

3.00%

100.00%

43483424.00

0.00

43483424.00

91.03%

 

b) Construction of R.C.C Drain starting from Chalk Bazar to Foisal Hospital to Nobab Bari with 5 Numbers Cross Culvert (ch 0+00-0+583 m).

 

c) Construction of R.C.C Drain starting from Chalk Bazar Poura Market to 2nd Muradpur Culvert. (ch 0+00-0-1+775 m).

 

CGP B2 -23

d) Re- construction of RCC  road from Old Dhaka-Chattogram highway to  road to New Dhaka-Chattogram Highway. Ch.0+000 to 1+480 m and link-1 Ch:0-150, link-2 ch:0-102 m and link-3 ch:0-95 m (Kalir bazar road with 6 nos box culvert).

 

39056000.00

39026969.978

43738356.00

29/01/2020

29.10.2020

29.06.2021

421

100.00%

0.00%

100.00%

33358290.00

4899999.00

38258289.00

87.47%

 

 

 

 

CGP B2 -24

 

a) Improvement of road start from Sangraish to Sanitary land field (Bibir bazar) road (ward no. -17) at Ch. 00-1070m. b) Improvement of road start from old Ctg. (GodirPukurpar) to Mainamoti Medical Road via Sigma Hospital to Nurpur Primary School (ward no.-18) at Ch. 00-970m. c) Improvement of road start from Songraish bibir bazar road to Doctor bari road and Takpukurpar road (ward no.16) at Ch. 00-0+130m. & 300m. d) Improvement of road start from Engineer Mojibur House to New hostel (ward no.13) at Ch. 00-0+302m e) Improvement of road start from Jamtola road to Dha-Ctg New Highwayroad (ward no. 27) at Ch. 00-750m f) Improvement of road start from Tikkarchar graveyard to Bibir bazar road and Link-1,2,3 & 4(ward no. 17) at Ch. 00-630m g) Improvement of Kaptan Bazar Road (Ch. 0+000 to 0+100m) & Link-02 BeparyPokurpar Road (Ch. 0+000 to 0+472m). h) Improvement RCC Road Start from Kaptan Bazar Adv. Keramot Ali House to Bou Bazar Via Old Gomiti River (Ch. 0+000 to 0+226m). i) Improvement of RCC Drain & Road Start from Gobindapur Chowmohony Primary School to Khanka Sharif Mosque. (Drain Ch. 0+000 to 0+470 & Link 1 Ch. 060m, Link-2 Ch. 070, Link-3 Ch. 050, Link-4 Ch. 050, Link-5 Ch. 031, Link-6 Ch. 090 & 08 Nos Cross Drain) & (Road Ch. 0+000 to 0+498m) j) Improvement of RCC Drain & Road Start from Tomsom Bridge to M Ali Steel House. (Drain Ch. 0+000 to 0+213 & Link 1 Ch. 170m & 01 Nos Cross Drain) & (Road Ch. 0+000 to 0+213m, Link-01 Ch. 0+000 to 0+170m & Link-02 Ch. 0+000 to 0+045m). k) Estimate for Construction of of RCC Road at Chakbazar Teri Pottry Road (Ch. 0+000 to 0+281m). l) Estimate for Construction of Road at Badsha Miah Bazar (Ch. 0+000 to 0+480m) With 03 Nos Cross Drian.

Road= 7841 m, Cross Drian- 11 Nos

---

---

---

---

---

---

---

---

---

---

TEC Committee  Regulation Submitted for Approved

CGP B2 -25

 

a) Improvement of road start from Nobabbari road to Zinarpukur par road and Nobabbari road to Dhopabari road (ward no. 13) at Ch. 00-140m. and Ch. 00-160m. b) Improvement of road start from Ranir bazar road to Koatbari (Rammala) road (ward no. 8) at Ch. 00-1120m c) Improvement of road start from Lacsam road to EPZ (Sobujkuti) road and Sadargazi road with Link (ward no. 21 (at Ch. 00-580 m and Ch.0-277, Link-1-(Ch.0-210), Link 2 (Ch. 0-95) d) Improvement of road start from New Dhk-Ctg Highway to Old Dhk-Ctg Highway Road (Khamarbari) with link-1,2 & 3 at Ch. 00-1140m e) Improvement RCC Road Start from Old Dhk-Ctg Highway to Mugoltoly road (Jamtoli road) Ch.00-170 f) Improvement RCC Road Start from Old Dhk-Ctg Highway to Mugoltoly road (Zilapipotti road) Ch.00-150 g) Improvement RCC Road Start from Badurtola QR tower to kandir par road Ch.00-160m. h) Improvement RCC Road Start from Talpukur par to Nazrul Avenue Ch.00-150 i) Improvement RCC Road Start from Police line Grammen office road to Talpukur par road and Link. (Ch. 0-420) and (Ch. 0+350) m.

Road= 12963 m

---

---

---

---

---

---

---

---

---

---

TEC Committee  Regulation Submitted for Approved